Year: 2019
Price: Available on Request
Status: New
Hours: 0
Starts: 0
Fuel: Gas
KW: 54,000
Hz: 50
Enclosure: yes
They were originally intended for Iraq for high ambient temperatures, low seismic loads and low wind conditions (design conditions).
Preparations for shipping take 90 days
They are currently configured to operate on gas fuel and have an ISO output of 54 MW each.
The current 14 meter exhaust is designed to be modified with a diverter device if future combined cycle operation is required.
Once the potential location is identified, the plant requires some plant components, e.g. B. High voltage transformers, auxiliary transformers, starting transformers, heat exchangers, gas fuel compressors, cooling coils, spare parts, air compressors, to name a few…
There are currently 6 SGT800 systems, 54MW each, gas turbines, YOM 2019
The intention is to sell these into a contract on an “As-Is, Where-Is” basis.
After receipt of payment, Siemens will test the systems and deliver them with a factory guarantee after the test period of 3 months.